The Caffeinated Penguin

musings of a crackpot hacker

Project update: Pirate ship

Posted By on September 14, 2015

We worked on the pirate ship labor day weekend and got the siding two swings up:

20150912_145811

20150912_145723

20150912_145735

20150912_145746

This past weekend (the 12th), we got the last swing up and I cut portholes, but it’s been raining ever since so I haven’t gotten pictures of that.

We have about one day of work left, and then we’ll have completed everything we had planned ahead of time, though I suspect we’ll add things periodically as time progresses (a quaterboard and crow’s nest are the two we can think of right now).